ShipStore web site ShipStore advertising
testata inforMARE
ShipStore web site ShipStore advertising

18 December 2018 The on-line newspaper devoted to the world of transports 18:12 GMT+1



October 4, 2018

This page has been automatically translated by
Original news
Started the work for I renew of the dock South of the container terminal of MCT to Gioia Tauro

The participations will interest beyond 130.000 square metres of surface

The terminalista group Contship Italy has announced the start of the work for renews of the dock South of the container terminal of the port of Gioia Tauro, that Container is managed by own Medcenter branch Terminal (MCT). The participations will interest beyond 130.000 square metres of surface of the terminal, of which 60,000 square metres of practicability corridors and 70,000 square metres of dock areas, with a next increase of about 12 meters of the destined area to the circulation of operating means.

In particular, the operations will interest the corridors between parks, with the removal of the paving in being in bituminous conglomerate that will be replaced by a mantle in reinforced concrete, and the before practicability the parks, with the removal of self-locking the existing paving in and the rifacimento of the foundation with finish in bituminous conglomerate. Relatively to the dock areas, the existing paving will be replaced with a paving in concrete with finishes in bituminous conglomerate.

Emphasizing that the development of the participations impatterà in some way the operating activities of the terminal, Contship Italy has not specified that the investment by MCT piles to beyond 14 million euros and that the term of the work is previewed within on December 31, 2019.

ABB Marine Solutions



Search for hotel
Destination
Check-in date
Check-out date








Index Home Page News

- Piazza Matteotti 1/3 - 16123 Genoa - ITALY
phone: +39.010.2462122, fax: +39.010.2516768, e-mail