ShipStore web site ShipStore advertising
testata inforMARE
ShipStore web site ShipStore advertising

14 December 2018 The on-line newspaper devoted to the world of transports 22:30 GMT+1



November 29, 2018

This page has been automatically translated by
Original news
Fincantieri will participate to the construction of a bridge suspended in Rumania

The store clerk has a value of about 70 million euros

Fincantieri has announced that through its controlled Fincantieri Infrastructure it will participate to the construction in Rumania of a suspended bridge that once completed, with a total length of 1.975 meters and a central span of 1.120 meters, will be longest of the Country and third party with longer the central span in Europe. To the start of the work, in June 2019, will be the bridge suspended larger to the world currently about to realization.

The value of the contract for Fincantieri is pairs to about 70 million euros, ulteriorly incrementabile in case was assigned to the Italian navalmeccanico group other asset still negotiation object.

Based on the order Fincantieri Infrastructure it will supply the metallic bridge floor of the bridge to joint venture formed from Astaldi Spa and IHI Infrastructure Systems Co., awardee of the contract by the Compania Nationala de Administrare to Infrastructurii Rutiere (C.N.A.I.R.), that it will cure the planning and the installation. The work will last about 24 months.

The bridge will rise on the Danube to single eight kilometers of distance from the citizen of Braila, in Rumania, where the plant of Vard has center, society of the Fincantieri group. The yard will employ about 200 resources for the realization and the assemblage of the 79 blocks of steel of the bridge floor, for a total 20,000 tons. The activities of constructive planning and ingegnerizzazione will be realized near the plant of Valeggio on the Mincio (Verona), former center Cordioli & C., recently acquired from Fincantieri Infrastructure.

Fincantieri, with Salt, is candidated to the construction of a new highway viaduct to Genoa that will replace Morandi Bridge, that it is collapsed last August. The managing director of Fincantieri, Giuseppe Bono, has emphasized that the store clerk for the bridge in Rumania represents for the group "a result of extraordinary strategic valence, because to afford us to consolidate our presence in a highly specialistic market and from the great potentialities. Thanks to this contracted - he has evidenced - Fincantieri Infrastructure, in fact, it will be the first Italian society to collaborate to the realization of a suspended bridge of these dimensions, that he will constitute a prestigious reference that in little to the world only can boast. I can also add that with IHI Corporation, Japanese multinational world leader in the planning and realization of bridges suspended, has already intavolato interesting arguments in order to estimate possible ulterior collaborations times to the development of ours two society".

ABB Marine Solutions
Consorzio ZAI



Search for hotel
Destination
Check-in date
Check-out date








Index Home Page News

- Piazza Matteotti 1/3 - 16123 Genoa - ITALY
phone: +39.010.2462122, fax: +39.010.2516768, e-mail