ShipStore web site ShipStore advertising
testata inforMARE
ShipStore web site ShipStore advertising

24 August 2019 The on-line newspaper devoted to the world of transports 02:26 GMT+2



July 23, 2019

This page has been automatically translated by
Original news
In the port of Livorno the investigations will be under way on the backdrop on which the Europe Platform will rise

The geognostiche, geophysical and environmental analyses will last 210 days

The Authority of Harbour System of the Tyrrhenian Sea Northern has announced that, after the positive outcome of the operations of war reclamation, the geognostiche, geophysical investigations can leave in the port of Livorno and environmental propedeutiche to the planning and realization of the Europe Platform that is previewed will be carried out in 210 natural and consecutive days. They are previewed, between the other things, geotecnici studies geologic-geophysicists with batimetrici reliefs of detail, studies with execution of 30 surveys to continuous borehole and 38 tests in site executed by floating pontoon and autosollevante floating platform; environmental studies with withdrawal of money of champions of backdrop to small depth and with execution of ten surveys to continuous borehole until 15 meters beneath of the seabed

Bathymetric the geophysical investigations/, with that geotecnica, will afford to define the morphologic, stratigraphic and geomeccaniche characteristics of lands, while with the environmental investigation it will be possible to inquire on the characteristics of the sediments that constitute the seabed. The activities will afford to acquire the necessary acquaintances of the geomeccanici parameters reported to the marine basement where the work of expansion to sea of the Leighorn port of call will rise.



PSA Genova Pra' Vincenzo Miele


Search for hotel
Destination
Check-in date
Check-out date








Index Home Page News

- Piazza Matteotti 1/3 - 16123 Genoa - ITALY
phone: +39.010.2462122, fax: +39.010.2516768, e-mail